Ing.

Rudolf Čejka

Head of Department

+420 54114 1221
cejkar@fit.vut.cz
L130 Office
2741/BUT personal ID

Projects

  • 2023

    Reanimated book - digitized library treasures for the creative industries, MC CR, DH23P03OVV033, 2023-2027, running, start: 2023-03-01, end: 2027-12-31
    Detail

  • 2022

    Transformation of the education form and content at the Brno University of Technology, MŠMT CR, 2022-2024, completed, start: 2022-07-01, end: 2024-06-30
    Detail

  • 2020

    Next Generation of Integrated Atomic Force and Scanning Electron Microscopy, TACR, TACR FW01010183, 2020-2023, completed, start: 2020-04-01, end: 2023-03-31
    Detail

  • 2017

    Infrastructure for modern studium of IT, MŠMT CR, 2017-2022, completed, start: 2017-10-01, end: 2022-09-30
    Detail

    Integrated platform for analysis of digital data from security incidents, MV CR, VI20172020062, 2017-2020, completed, start: 2017-01-01, end: 2020-06-30
    Detail

    Moderní a otevřené studium techniky (MOST), MŠMT CR, 2017-2022, completed, start: 2017-09-01, end: 2022-12-31
    Detail

  • 2016

    IT4Innovations excellence in science, MŠMT CR, LQ1602, 2016-2020, completed, start: 2016-01-01, end: 2020-12-31
    Detail

  • 2011

    Modernization of faculty backbone switch, FRVŠ MŠMT, FR1411/2011/Ac, 2011, completed, start: 2011-01-01, end: 2011-12-31
    Detail

  • 2010

    Modern Tools for Detection and Mitigation of Cyber Criminality on the New Generation Internet, MV CR, VG20102015022, 2010-2015, completed, start: 2010-10-01, end: 2015-09-30
    Detail

  • 2008

    ATLANTIS-DeSIRE^2: Dependable Systems International Research and Educational Experience, EC EU, ATLANTIS-DESIRE, 2008-2013, completed, start: 2008-10-01, end: 2013-09-30
    Detail

  • 2006

    Increasing of qualification in the area of network security and wireless technologies, CESNET, CESNET 2006, 2006-2008, completed, start: 2006-05-04, end: 2008-05-30
    Detail

    Toward International Learning Environment for Real-Time Safety-Critical Control Systems (ILERT), EC EU, ATLANTIS-ILERT, 2006-2008, completed, start: 2006-11-01, end: 2008-12-31
    Detail

  • 2004

    Optická síť národního výzkumu a její nové aplikace, CEZ MŠMT, MSM6383917201, 2004-2010, completed, start: 2004-01-01, end: 2010-12-31
    Detail

  • 2002

    Parallel system performance prediction and tuning, GACR, GA102/02/0503, 2002-2004, completed, start: 2002-01-01, end: 2004-12-31
    Detail

  • 2001

    MOBIVAS - Downloadable MOBIle Value-Added Services through Software Radio & Switching Integrated Platforms, UNKNOWN, IST-1999-10206, 2001-2002, completed, start: 2001-08-23, end: 2002-04-02
    Detail

  • 1999

    Research in information and control systems, CEZ MŠMT, MSM 262200012, 1999-2004, completed, start: 1999-01-01, end: 2004-12-31
    Detail

Back to top